Request A Quote

Close
  • Request A Quote
  • Applications

    Mining Water Tanks

    Compliant and durable mining solutions

    Procurement and Safety Compliant: SBS® water storage solutions are ISO 9001:2015 and ISO 45001:2018 compliant. Tanks are manufactured to exacting standards and erected by skilled in-house installation teams. The SBS® team ensures that country specific legislative requirements are met, facilitating a speedy solution.

    Applications

    SBS® offers a wide range of water and liquid storage solutions to meet the diverse and exacting needs of the mining, municipal, fire protection and commercial sectors, with a focus on working to develop comprehensive solutions that address the need for water conservation.

    Applications

    SBS Energy has developed a solution that not only addresses the need for backup power, but puts the power back in business owner's hands with an easy-to-use dashboard system.

    Case Studies

    Complete water storage solution for mining

    South Africa is known to have the largest reserves of fluorspar globally. The source of fluorite, fluorspar has many uses including the production of certain glasses and enamels. It is also a source of fluorine, an element that is used in the production of non-stick coating for frying pans.

    Case Studies

    Replacing ageing infrastructure with a premium solution

    Lafarge Mining Tygerberg in Cape Town contacted SBS® for quotations to replace their ageing water storage infrastructure at the crusher plant, which was rusted, leaking and in danger of collapsing threatening the adjacent office park. Lafarge opted for a tank with effective capacity of 180kl to mitigate the immediate crisis they were facing.

    Case Studies

    Azura Offices

    Requirements:

    Cost saving and back-up energy to ensure that the Azura offices remain operational durning load shedding.

    Solution:

    SBS Energy installed 44kW of PV on tilt racks with a 100kW Atess inverter coupled to a 200kWh Freedom Won battery.

    Case Studies

    Superspar Witbank

    Requirements:

    The client required a solution that would produce as much alternate energy from solar to offset costs and integrate with a 1.2MW Generator.

    Solution:

    SBS Energy installed a 500kW peak grid-tied solution flooding all available roof space with solar.

    Case Studies

    Berea Centre

    Requirements:

    Find cost savings through alternate energy supply.

    Solution:

    SBS Energy installed a 375kW Peak grid tied solar solution.

    Case Studies

    Cabriolet Auto

    Project Requirements:

    Looking for an alternate energy solution to offset day time consumption and realise savings.

    Solution:

    SBS Energy installed a 90kW grid tied solar solution.

    Case Studies

    Gace Farming

    Project Requirements:

    To provide Gace Farming with a cost saving through the production of alternate energy. Gace farming was also faced with the problem of not being able to increase their supply from Eskom. As the farm has expanded over the years, the energy requirement now exceeds that of the current supply so the they needed supplementary supply from solar.

    Solution:

    SBS Energy installed a 120kW peak grid tied solar solution, integrated with a 100kVa generator.

    Case Studies

    TerraMacs Farming

    Requirements:

    Provide savings and power to the TerraMacs farming operation, including the irrigation and fertigation plants, and the homestead.

    Solution:

    SBS Energy installed 22kW of PV coupled to 2 x 12kW Sunsynk inverters, with a 40kWh Freedom Won battery.

    Case Studies

    Ellingham Farm Offices

    Requirements:

    Keep the offices at Ellingham farm running through load shedding.

    Solution:

    SBS Energy installed 22kW of PV coupled to a 2 x 12 Sunsynk inverters, with 20kWh of battery storage.

    Case Studies

    Cole Farming – Dam

    Requirements:

    Cost saving and back-up energy to ensure that the irrigation and fertigation plant for the macadamias remained operational during load shedding and grid failures.

    Solution:

    SBS Energy installed a 22kW PV ground mount array with a 50kW Sunsynk inverter coupled to a 60kWh Freedom Won battery.

    The ground out was designed and installed by the SSB team and is part of the turn key solution offered by SBS Energy. The ability to keep the process in house allows the SBS team greater control on deliverables whilst saving on cost.

    Case Studies

    Cole Farming – Main

    Requirements:

    Cost saving and back-up energy to ensure that all farming operations and the homes on the farm would remain operational durning load shedding.

    Solution:

    SBS Energy installed a 80kW PV ground mount array with a Atess 100kW inverter coupled to a 200kWh Freedom Won battery.

    The ground mount was designed and installed by the SSB team and is part of the turn key solution offered by SBS Energy. The ability to keep the process in house allows the SBS team greater control on deliverables whilst saving on cost.

    Case Studies

    Scribante Farm

    Requirements:

    Hybrid solar solution for the house and stable complex.

    Solution:

    SBS Energy installed a 40kWh Freedom Won battery storage solar solution with 24kW of inverter capacity.

    Case Studies

    Mackenzie Farms

    Requirements:

    Back-up energy solar energy solution to ensure that milking and refrigeration would be maintained despite load-shedding and power interruptions.

    Solution:

    SBS Energy installed 100kW of PV, with 3 x 50kW Atess inverters and 200 KWh of battery storage from Freedom Won.

    Case Studies

    Atholl Heights Primary School

    Project Requirements:

    Backup energy solution for school administration offices.

    Solution:

    The solution boasts 30kWh of battery storage, allowing for a seamless transition to the backup energy source during blackouts, and providing an uninterrupted power supply to the school’s essential administration hub.

    SBS Tanks